3、計算過程
(注意:配料總重量為四種配料重量之和)
C₁=60x3.0/100+40x0.6/100+1x99/100
=1.8+0.24+0.99
=3.03
Si₁=60x2.0/100+40x0.3/100+1x50/100
=1.2+0.12+0.5
=1.82
C₂=3.03(1+0.1)=3.333
Si₂=1.82(1-0.1)=1.638
C=3.333x100/102=3.268=____1___%
Si=1.638x100/102=1.606=___2____%
CE=3.268+1/3(1.606)=3.803=____3___%
1.